EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
The 8 inches Pinang – Pager gas transmission line replacement, in the segment between Kerang and Ubi field for about 4.8 kilometers length, is one of 2006‐2007 Business Plans of Sumatera Light‐oil North (SLN), PT Chevron Pacific Indonesia (CPI). It is defined as a project sinc...
Saved in:
Main Author: | ZAINUDDIN (NIM : 29106380); Pembimbing: Ir. Rudy Bekti, MM , AHMAD |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17853 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
by: ZAINUDDIN (NIM : 29106380), AHMAD -
Simulation of a pager assembly line
by: Chu, Pao Liang.
Published: (2010) -
AN EVALUATION OF THE PROJECT PERFORMANCE OF CRUDE OIL TEST STATION DEVELOPMENT OF PT. CHEVRON PACIFIC INDONESIA'S AT KULIN AREA ̉̉ RIAU
by: BASUKI (NIM : 29106374); Pembimbing : Ir. Rudy Bekti, MM, WASONO -
PROJECT PROPOSAL TO IMPROVE POWER SYSTEM RELIABILITY AT DURI HOOU CRITICAL FACILITIES PT. CHEVRON PACIFIC INDONESIA
by: ADRIANUS AMBAR BAWONO WISNUBROTO ( NIM: 29106369); Pembimbing: Ir. Rudy Bekti, MM, -
Engineering faculty pager system
by: Corpus, Michael Vincent M., et al.
Published: (1996)