DESIGN OF MAINTENANCE PERFORMANCE INDICATOR AT PTCPI
The success of oil and gas company is being measured by total production that could delivered to costumer and generate revenue. Currently both operation and maintenance team had an equal strong contribution to the increasing of oil production. However performance measure from both departments are no...
Saved in:
Main Author: | ZATNIKA SUKMA AJI (NIM: 29106372); Pembimbing: Dr. Ir. Dermawan Wibisono, M. Eng, ARFI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18035 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF MAINTENANCE PERFORMANCE INDICATOR AT PTCPI
by: ZATNIKA SUKMA AJI (NIM: 29106372); Pembimbing: Dr. Ir. Dermawan Wibisono, M. Eng, ARFI -
DESIGN OF MAINTENANCE PERFORMANCE INDICATOR AT PTCPI
by: ZATNIKA SUKMA AJI (NIM: 29106372); Pembimbing : Dr. Ir. Dermawan Wibosono M.Eng, ARFI -
CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING
by: KOSASIH (NIM: 29107087); Pembimbing :Dr. Ir. Dermawan Wibisono, M.Eng, OKTORIUS -
THE DESIGN OF ONLINE PERFORMANCE MANAGEMENT SYSTEM BY USING INTEGRATED PERFORMANCE MEASUREMENT SYSTEM FRAMEWORK (Case Study at Metallurgy Accounting Departement PT Freeport Indonesia)
by: HANAFI (NIM : 29107110); Pembimbing: Dr.Ir. Dermawan Wibisono, M. Eng, MUHAMMAD -
DESIGN OF PERFORMANCE MANAGEMENT SYSTEM BASED ON MALCOLM BALDRIGE CRITERIA FOR EXCELLENCE IN RSUP DR. HASAN SADIKIN BANDUNG
by: TAKARINI (NIM : 29107033); Pembimbing: Dr.Ir.Dermawan Wibisono,M.Eng, MARTIN