ANALYSIS AND PROPOSAL OF OUTSOURCING STRATEGY OF ENGINEERING, CONSTRUCTION AND CONSTRUCTION SUPERVISION SERVICES FOR SURFACE FACILITIES AS PART OF OPERATIONS STRATEGY OF PT CHEVRON PACIFIC INDONESIA
In the past two decades, along with the fluctuation of oil and gas price in the market and the changes of labor law, outsourcing strategy for engineering, construction and construction supervision for surface facilities at PT Chevron Pacific Indonesia (CPI) had revolutionized. Revolution was began w...
Saved in:
Main Author: | SIGIT PRATOPO, ST (NIM: 29106364) ; Pembimbing: Dr. Ir. Gatot Yudoko, IGNATIUS |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18672 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPERATIONS STRATEGY TO IMPROVE PERFORMANCE AND QUALITY OF MAINTENANCE SUPPORT SERVICES PT CHEVRON PACIFIC INDONESIA
by: (NIM: 291063830; Pembimbing: Dr. Ir. Gatot Yudoko, NURSYIRWAN -
A PROPOSED OPERATIONS STRATEGY FOR STEAM & SUPPLY TEAM HEAVY OIL OPERATING UNIT OF PT CHEVRON PACIFIC INDONESIA, SUMATERA OPERATIONS, INDOASIA BUSINESS UNIT
by: MARTIN (NIM: 29106379) ; Pembimbing: Dr. Ir. Gatot Yudoko, FERRY -
PROJECT PROPOSAL TO IMPROVE POWER SYSTEM RELIABILITY AT DURI HOOU CRITICAL FACILITIES PT. CHEVRON PACIFIC INDONESIA
by: AMBAR BAWONO WISNUBROTO (NIM: 29106369), ADRIANUS -
PROJECT PROPOSAL TO IMPROVE POWER SYSTEM RELIABILITY AT DURI HOOU CRITICAL FACILITIES PT. CHEVRON PACIFIC INDONESIA
by: ADRIANUS AMBAR BAWONO WISNUBROTO ( NIM: 29106369); Pembimbing: Ir. Rudy Bekti, MM, -
STRATEGY FORMULATION PROPOSAL FOR PT. S
by: ANGRAINI (NIM: 29107308); Pembimbing: Dr. Ir. Gatot Yudoko, AMELIA