PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI
The main business driver for this initiative is that gas compressor at Bekasap gas plant has low performance and encounter aging equipments that affects to operation and maintenance of existing gas compression system. The effects on its performance can be seen in unscheduled <br /> <b...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18763 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:18763 |
---|---|
spelling |
id-itb.:187632017-09-27T15:31:05ZPLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI PRIBAWANA (NIM : 29106356) ; Pembimbing: Ir. Rudy Bekti, MM, JOHAR Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18763 The main business driver for this initiative is that gas compressor at Bekasap gas plant has low performance and encounter aging equipments that affects to operation and maintenance of existing gas compression system. The effects on its performance can be seen in unscheduled <br /> <br /> <br /> <br /> <br /> downtime that has been increasing since 2004. The purpose of this optimization is to have more reliable operation and easier maintenance of gas plant by doing optimization on gas compression system.This optimization plan is aligned with company business plan objectives that one of them is to improve facility and equipment reliability. By having reliable gas compressor for Bekasap gas plant will make safe, reliable, easier operation and maintenance.Current Bekasap gas plant operates gas compressor to produce around 1,800,000 scfd gases from Bekasap gathering station that produces associate gas and gas wells. After more than 40 years in service, this compressor has low reliability and availability. There are many alternatives for project to optimize gas compression system but only six possible alternatives as follows: 1. Replacement of existing gas compressor with a new gas compressor with same type and <br /> <br /> <br /> <br /> <br /> capacity. 2. Replacement of existing gas compressor with a new gas compressor with same type but lower capacity. <br /> <br /> <br /> <br /> <br /> 3. Replacement of existing gas compressor with a new screw gas compressor with capacity and electric motor driver 4. Replacement of existing gas compressor with an eductor gas compression sytem. 5. Replacement of existing gas compressor with a new gas compressor with same type but lower capacity and electric motor driver <br /> <br /> <br /> <br /> <br /> 6. Betterment of existing gas compressor with overhaul and control system retrofit The alternatives will be reviewed using current Chevron Project Development and Execution Process (CPDEP) as company tools in developing project and other tools in project management. The tool which is applied in alternative selection is Com-pair Prioritization, one of tools in CPDEP. The criteria for alternative selection are both quantitative and qualitative parameter. Economic analysis which consists of NPV, IRR and payback period is used for quantitative parameter. Qualitative parameter uses operability, maintainability, safety, required time and risk in developing project. By using this tool, alternative 5 or replacement of existing gas compressor with a new gas compressor with same type but lower capacity and <br /> <br /> <br /> <br /> <br /> electric motor driver is best alternative for this optimization project. After selecting alternative, next phase is implementation plan which contains project cost and schedule, resources, risk management, changes control and project close out. By implementing the plan, the gas compressor is expected to operate reliably and safely with cost effectiveness. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The main business driver for this initiative is that gas compressor at Bekasap gas plant has low performance and encounter aging equipments that affects to operation and maintenance of existing gas compression system. The effects on its performance can be seen in unscheduled <br />
<br />
<br />
<br />
<br />
downtime that has been increasing since 2004. The purpose of this optimization is to have more reliable operation and easier maintenance of gas plant by doing optimization on gas compression system.This optimization plan is aligned with company business plan objectives that one of them is to improve facility and equipment reliability. By having reliable gas compressor for Bekasap gas plant will make safe, reliable, easier operation and maintenance.Current Bekasap gas plant operates gas compressor to produce around 1,800,000 scfd gases from Bekasap gathering station that produces associate gas and gas wells. After more than 40 years in service, this compressor has low reliability and availability. There are many alternatives for project to optimize gas compression system but only six possible alternatives as follows: 1. Replacement of existing gas compressor with a new gas compressor with same type and <br />
<br />
<br />
<br />
<br />
capacity. 2. Replacement of existing gas compressor with a new gas compressor with same type but lower capacity. <br />
<br />
<br />
<br />
<br />
3. Replacement of existing gas compressor with a new screw gas compressor with capacity and electric motor driver 4. Replacement of existing gas compressor with an eductor gas compression sytem. 5. Replacement of existing gas compressor with a new gas compressor with same type but lower capacity and electric motor driver <br />
<br />
<br />
<br />
<br />
6. Betterment of existing gas compressor with overhaul and control system retrofit The alternatives will be reviewed using current Chevron Project Development and Execution Process (CPDEP) as company tools in developing project and other tools in project management. The tool which is applied in alternative selection is Com-pair Prioritization, one of tools in CPDEP. The criteria for alternative selection are both quantitative and qualitative parameter. Economic analysis which consists of NPV, IRR and payback period is used for quantitative parameter. Qualitative parameter uses operability, maintainability, safety, required time and risk in developing project. By using this tool, alternative 5 or replacement of existing gas compressor with a new gas compressor with same type but lower capacity and <br />
<br />
<br />
<br />
<br />
electric motor driver is best alternative for this optimization project. After selecting alternative, next phase is implementation plan which contains project cost and schedule, resources, risk management, changes control and project close out. By implementing the plan, the gas compressor is expected to operate reliably and safely with cost effectiveness. |
format |
Theses |
author |
PRIBAWANA (NIM : 29106356) ; Pembimbing: Ir. Rudy Bekti, MM, JOHAR |
spellingShingle |
PRIBAWANA (NIM : 29106356) ; Pembimbing: Ir. Rudy Bekti, MM, JOHAR PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI |
author_facet |
PRIBAWANA (NIM : 29106356) ; Pembimbing: Ir. Rudy Bekti, MM, JOHAR |
author_sort |
PRIBAWANA (NIM : 29106356) ; Pembimbing: Ir. Rudy Bekti, MM, JOHAR |
title |
PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI |
title_short |
PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI |
title_full |
PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI |
title_fullStr |
PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI |
title_full_unstemmed |
PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI |
title_sort |
plan of gas compression system optimization at bekasap gas plant pt. chevron pacific indonesia ãâãâ duri |
url |
https://digilib.itb.ac.id/gdl/view/18763 |
_version_ |
1821119630852227072 |