PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI
The main business driver for this initiative is that gas compressor at Bekasap gas plant has low performance and encounter aging equipments that affects to operation and maintenance of existing gas compression system. The effects on its performance can be seen in unscheduled <br /> <b...
Saved in:
Main Author: | PRIBAWANA (NIM : 29106356) ; Pembimbing: Ir. Rudy Bekti, MM, JOHAR |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18763 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
by: ZAINUDDIN (NIM : 29106380); Pembimbing: Ir. Rudy Bekti, MM , AHMAD -
PROJECT PROPOSAL TO IMPROVE POWER SYSTEM RELIABILITY AT DURI HOOU CRITICAL FACILITIES PT. CHEVRON PACIFIC INDONESIA
by: ADRIANUS AMBAR BAWONO WISNUBROTO ( NIM: 29106369); Pembimbing: Ir. Rudy Bekti, MM, -
QUANTITATIVE RISK ASSESSMENT FOR STORAGE TANK CASE STUDY: CGS 10 DURI, PT CHEVRON PACIFIC INDONESIA
by: (NIM : 13105066); Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, ATIKA -
AN EVALUATION OF THE PROJECT PERFORMANCE OF CRUDE OIL TEST STATION DEVELOPMENT OF PT. CHEVRON PACIFIC INDONESIA'S AT KULIN AREA ̉̉ RIAU
by: BASUKI (NIM : 29106374); Pembimbing : Ir. Rudy Bekti, MM, WASONO -
EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
by: ZAINUDDIN (NIM : 29106380), AHMAD