A PROPOSAL OF PERFORMANCE IMPROVEMENT OF RELIABILITY ENGINEERING IN HEAVY OIL OPERATION UNIT ‐ PT. CHEVRON PACIFIC INDONESIA
PT. Chevron Pacific Indonesia (CPI) especially Heavy Oil OperatingUnit (HOOU),has a great commitment to increase the reliability of its facilities. Focus on the implementation of reliability has been started since 2004 with the development of Team Reliability Engineering (TRE). TRE is expected to be...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19170 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!