A PROPOSAL OF PERFORMANCE IMPROVEMENT OF RELIABILITY ENGINEERING IN HEAVY OIL OPERATION UNIT ‐ PT. CHEVRON PACIFIC INDONESIA

PT. Chevron Pacific Indonesia (CPI) especially Heavy Oil OperatingUnit (HOOU),has a great commitment to increase the reliability of its facilities. Focus on the implementation of reliability has been started since 2004 with the development of Team Reliability Engineering (TRE). TRE is expected to be...

Full description

Saved in:
Bibliographic Details
Main Author: NUGROHO (NIM: 29106310); Pembimbing: Dr. Ir. Gatot Yudoko, PUJI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19170
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items