GROUP PILE SYSTEM PLANNING IN DEVELOPMENT PROJECTS OF ABSORPTION TOWER
The function of the foundation is to continue or transfer the loads from the structure above it. Loads on the structure shall be transferred to the soil layer so the foundation can bear the loads, example: pile foundation. If the pile foundation used to support a tall building then the pile structur...
Saved in:
Main Author: | YUDHA ISA (NIM : 15005060); Pembimbing : Ir. Erza Rismantojo, Ph.D, SHANDY |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19461 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TOWER A AND B PURI PARKVIEW APARTMENT BORED PILE FOUNDATION AND BASEMENT DESIGN
by: ARLEN HARTANU (NIM : 15007042); Pembimbing : Ir. F.X Toha, MSCE, MSEM, Ph.D, DARRYL -
Performance of a computer simulated discrete gas absorption tower: Project study
by: Hernandez, Alexander Luis A., et al.
Published: (1984) -
Optimisation of tower crane usage in planning of precast construction projects
by: DUONG TRUONG SON
Published: (2010) -
Binate towers of groups
by: Berrick, A.J., et al.
Published: (2014) -
SOIL-STRUCTURE INTERACTION ANALYSIS OF PILES FOUNDATION OF CIPUTRA WORLD 1 TOWER 4 BUILDING
by: TANJUNG (NIM: 15010112), CHRISTOPHER