PROPOSAL FOR IMPROVEMENT ON HAUL TRUCK̉̉S MAJOR COMPONENTS FAILURE BELOW THE TARGET LIFE CASE STUDY IN UNDERGROUND MINE PTFI
Underground Mine is the future mine of PT Freeport Indonesia (PTFI) with mineral reserve and life of mine until year 2041. The types of equipments utilized are <br /> <br /> <br /> articulated dump truck AD-30 and AD-55. Production target in year 2011 is 90k dmt/day that required...
Saved in:
Main Author: | P.B.E WOPARI (NIM : 29109114); Pembimbing: Dr. Ir. Mursyid Hasan Basri, YONGKI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19723 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Introducing GPS in fleet management of a mine: Impact on hauling cycle time and hauling capacity
by: Chaowasakoo,P., et al.
Published: (2015) -
Introducing GPS in fleet management of a mine: Impact on hauling cycle time and hauling capacity
by: Patarawan Chaowasakoo, et al.
Published: (2018) -
PROPOSAL OF DEVELOPMENT ACCELERATION IN DMLZ UNDERGROUND MINE AT PT. FREEPORT INDONESIA
by: MEIKO GUNAWAN HUTAURUK (NIM : 29109125); Dosen Pembimbing: Dr. Ir. Mursyid Hasan Basri, -
AVAILABILITY IMPROVEMENT OF AXERA 8 DRILL CASE STUDY IN UNDERGROUND MINE PT FREEPORT INDONESIA
by: YUDONO ARINTOKO (NIM : 29109113); Pembimbing: Dr. Ir. Mursyid Hasan Basri, -
ESTIMATION OF LOAD AND HAUL EQUIPMENT NEEDS IN UNDERGROUND MINING DEVELOPMENT ACTIVITIES DEEP MILL LEVEL ZONE PT FREEPORT INDONESIA
by: SIAHAAN (NIM : 121 06 033); Pembimbing : Dr. Ganda Marihot Simangunsong, S.T., M.T., ABRAM