#TITLE_ALTERNATIVE#
In 2002 operation team decided to stop operating the gathering station at X field and deliver the fluid from X field to gathering station Y field that located 8 Km from X field. The production team decided to optimize the operation be deliver fluid production from small field to one GS. After dispat...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20598 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!