#TITLE_ALTERNATIVE#
In 2002 operation team decided to stop operating the gathering station at X field and deliver the fluid from X field to gathering station Y field that located 8 Km from X field. The production team decided to optimize the operation be deliver fluid production from small field to one GS. After dispat...
Saved in:
Main Author: | ROSNEDY (NIM : 22211319); Pembimbing : Dr. Ir. Leksono Mucharam, VERY |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20598 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 12205007); Pembimbing: Dr.Ir. Leksono Mucharam, ADRIANTO -
#TITLE_ALTERNATIVE#
by: FERDIAN (NIM 12206085); Pembimbing: Dr. Ir. Leksono Mucharam, GERDHY -
#TITLE_ALTERNATIVE#
by: REZA (NIM 12205049); Pembimbing: Dr.Ir. Leksono Mucharam, FAHRAN -
#TITLE_ALTERNATIVE#
by: SITOMPUL (NIM 12206093); Pembimbing: Dr. Ir. Leksono Mucharam, DANIEL -
#TITLE_ALTERNATIVE#
by: JAELANI (NIM 12206094); Pembimbing: Dr. Ir. Leksono Mucharam, ARRAHMAD