#TITLE_ALTERNATIVE#

In 2002 operation team decided to stop operating the gathering station at X field and deliver the fluid from X field to gathering station Y field that located 8 Km from X field. The production team decided to optimize the operation be deliver fluid production from small field to one GS. After dispat...

Full description

Saved in:
Bibliographic Details
Main Author: ROSNEDY (NIM : 22211319); Pembimbing : Dr. Ir. Leksono Mucharam, VERY
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/20598
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items