#TITLE_ALTERNATIVE#
PLTM Pageruyung-1 project which is sponsored by PT Trans Migasindo is a public private partnership (PPP) that will be carried out under build-own-operate-transfer (BOOT) scheme with a 15-year concession period. Currently the project is at the stage of seeking bank loans. However, with a feasibility...
Saved in:
Main Author: | MAULANA ARIJANTO (NIM : 14413023), ABDURRAHMAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20675 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: ARIJANTO (NIM 28196089), SUGIH -
#TITLE_ALTERNATIVE#
by: (NIM : 12508020), ABDURRAHMAN -
#TITLE_ALTERNATIVE#
by: ARROISI (NIM: 15011072), ABDURRAHMAN -
#TITLE_ALTERNATIVE#
by: Abdurrahman (NIM 221 04 020), Ruslan -
#TITLE_ALTERNATIVE#
by: ALI (NIM: 20211032); Pembimbing : Dr. Khairul Basar, ABDURRAHMAN