#TITLE_ALTERNATIVE#

PLTM Pageruyung-1 project which is sponsored by PT Trans Migasindo is a public private partnership (PPP) that will be carried out under build-own-operate-transfer (BOOT) scheme with a 15-year concession period. Currently the project is at the stage of seeking bank loans. However, with a feasibility...

Full description

Saved in:
Bibliographic Details
Main Author: MAULANA ARIJANTO (NIM : 14413023), ABDURRAHMAN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/20675
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first