PLAN OF IMPLEMENTATION METHOD,SCHEDULING,AND CONSTRUCTION COST ESTIMATING IN JOYOBOYO INTERMODAL STATION
Surabaya is the one of big city that has quite good at economic growth level. It is because of Surabaya is the one of center of important economic activities in Indonesia, that contributes 14,85 percent by National Domestic Growth Product. Therefore, Surabaya has strategic role in regional and natio...
Saved in:
Main Author: | WISDAYATI (NIM : 15013061), ANNISA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21150 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF TRANSPORTATIONAL ASPECTS OF JOYOBOYO INTERMODAL STATION PROJECT IN SURABAYA
by: ABDUL MALIK (NIM : 15013135), KHALIF -
DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
by: BUDI PRAKOSO - NIM : 15013017 , NICO -
DESIGN OF DRAINAGE AND RAIN WATER HARVESTING IN JOYOBOYO INTERMODAL STATION PROJECT SURABAYA
by: EINIL RIZAR DEWANTARA - NIM : 15013021 , FAUZAN -
DESIGN OF EARTHQUAKE-RESISTANT STEEL FRAMED STRUCTURE OF JOYOBOYO INTERMODAL STATION IN SURABAYA, INDONESIA
by: SURYANTO (NIM : 15013094), JUNIANTORO -
PLANNING IMPLEMENTATION METHOD, SCHEDULING, AND COST ESTIMATION OF CONTEMPORARY ART MUSEUM PROJECT
by: RIZKA, MUTHIANA