A BATCH SCHEDULING MODEL FOR A FLOW SHOP WITH DETERIORATING MACHINES PROCESSING MULTI ITEM WITH A COMMON DUE DATE TO MINIMIZE TOTAL ACTUAL FLOW TIME
Scheduling is very important in production activities, because it affects the productivity of the company. Scheduling needed for the allocation of resources such as machines, labor, and materials being organized and efficient. In the existing batch scheduling literature, one of the assumptions commo...
Saved in:
Main Author: | ANGGRAENI SIBARANI (NIM: 23414006), AYU |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21345 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR -
A BATCH SCHEDULING MODEL FOR A THREE STAGE FLOW SHOP WITH HETEROGENEOUS MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Nurainun (NIM 234 04 013), Tengku -
Batch Scheduling Model in Job Shop with Heterogeneous Group Machine to Minimizing Actual Flow Time
by: RIZVIYATMAJA SARIAN (NIM 23405003), FEDO -
A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
by: Brah, Shaukat A.
Published: (2018) -
A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
by: Brah, S.A.
Published: (2013)