CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI

This research explains the preparation of PT. Bosowa Maros Energi (BME) as a subsidiary company of PT. Bosowa Corporindo (BC) in preparing power plan project of 2x55 MW for internal use of PT. Semen Bosowa Maros (SBM). SBM is also a subsidiary company of Bosowa Corporindo (BC) in cement industry and...

Full description

Saved in:
Bibliographic Details
Main Author: FAREMI ADIRAMA (NIM 29115011), FARZA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22087
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22087
spelling id-itb.:220872017-09-28T11:53:24ZCAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI FAREMI ADIRAMA (NIM 29115011), FARZA Indonesia Theses Bosowa Group, Capital Budgeting, Electricity, and Coal Fired Steam Power Plant (CFSPP) INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22087 This research explains the preparation of PT. Bosowa Maros Energi (BME) as a subsidiary company of PT. Bosowa Corporindo (BC) in preparing power plan project of 2x55 MW for internal use of PT. Semen Bosowa Maros (SBM). SBM is also a subsidiary company of Bosowa Corporindo (BC) in cement industry and mainly operating in Maros Regency, South Sulawesi. Because of the nature of internal use, then decision making for building this power plant is different from the decision making for independent power plant sells power to PLN or special industrial area (KIK). Building this power plant must as effiient as possible with tariff sold to PT. SBM cannot exceed PLN electricity tariff. Thus, balancing tariff price as income and its total project cost must be assessed with the principle of prudentially, and win-win solution among Bosowa Group companies.. Analysis conducted in technical, environmental, legal, and financial area. Result of this research is Power Plant 2x55 MW Bosowa Maros Energy is ready (feasible) for technical, legal, environmental, and financial. All the aspects has been calculated with the accountable method, such as NPV and IRR, Payback Period, Balance Sheet analysis, Cash Flow analysis, legal analysis, environmental analysis, and many more in the Chapter III of this paper. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description This research explains the preparation of PT. Bosowa Maros Energi (BME) as a subsidiary company of PT. Bosowa Corporindo (BC) in preparing power plan project of 2x55 MW for internal use of PT. Semen Bosowa Maros (SBM). SBM is also a subsidiary company of Bosowa Corporindo (BC) in cement industry and mainly operating in Maros Regency, South Sulawesi. Because of the nature of internal use, then decision making for building this power plant is different from the decision making for independent power plant sells power to PLN or special industrial area (KIK). Building this power plant must as effiient as possible with tariff sold to PT. SBM cannot exceed PLN electricity tariff. Thus, balancing tariff price as income and its total project cost must be assessed with the principle of prudentially, and win-win solution among Bosowa Group companies.. Analysis conducted in technical, environmental, legal, and financial area. Result of this research is Power Plant 2x55 MW Bosowa Maros Energy is ready (feasible) for technical, legal, environmental, and financial. All the aspects has been calculated with the accountable method, such as NPV and IRR, Payback Period, Balance Sheet analysis, Cash Flow analysis, legal analysis, environmental analysis, and many more in the Chapter III of this paper.
format Theses
author FAREMI ADIRAMA (NIM 29115011), FARZA
spellingShingle FAREMI ADIRAMA (NIM 29115011), FARZA
CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI
author_facet FAREMI ADIRAMA (NIM 29115011), FARZA
author_sort FAREMI ADIRAMA (NIM 29115011), FARZA
title CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI
title_short CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI
title_full CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI
title_fullStr CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI
title_full_unstemmed CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI
title_sort capital budgeting strategy of power plant for internal use: case study of coal fired steam power plant (cfspp/pltu) 2x55 mw pt. bosowa maros energi for pt. semen bosowa maros in kabupaten maros, south sulawesi
url https://digilib.itb.ac.id/gdl/view/22087