CAPITAL BUDGETING STRATEGY OF POWER PLANT FOR INTERNAL USE: CASE STUDY OF COAL FIRED STEAM POWER PLANT (CFSPP/PLTU) 2X55 MW PT. BOSOWA MAROS ENERGI FOR PT. SEMEN BOSOWA MAROS IN KABUPATEN MAROS, SOUTH SULAWESI
This research explains the preparation of PT. Bosowa Maros Energi (BME) as a subsidiary company of PT. Bosowa Corporindo (BC) in preparing power plan project of 2x55 MW for internal use of PT. Semen Bosowa Maros (SBM). SBM is also a subsidiary company of Bosowa Corporindo (BC) in cement industry and...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22087 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |