POST DISTURBANCE ANALYSIS OF BLACKOUT IN BENGKULU SUBSYSTEM
Blackout that occurs in Bengkulu subsystem at February 15th 2017 was triggered by single phase ground fault in line near Lubuk Linggau substation 150 kV. The line clearing caused an islanding operation for Bengkulu subsystem from the South Sumatera Grid. This situation caused the small size generato...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22397 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |