POST DISTURBANCE ANALYSIS OF BLACKOUT IN BENGKULU SUBSYSTEM

Blackout that occurs in Bengkulu subsystem at February 15th 2017 was triggered by single phase ground fault in line near Lubuk Linggau substation 150 kV. The line clearing caused an islanding operation for Bengkulu subsystem from the South Sumatera Grid. This situation caused the small size generato...

Full description

Saved in:
Bibliographic Details
Main Author: SATYA DINI (NIM. 23216116), HASNA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22397
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia