POST DISTURBANCE ANALYSIS OF BLACKOUT IN BENGKULU SUBSYSTEM
Blackout that occurs in Bengkulu subsystem at February 15th 2017 was triggered by single phase ground fault in line near Lubuk Linggau substation 150 kV. The line clearing caused an islanding operation for Bengkulu subsystem from the South Sumatera Grid. This situation caused the small size generato...
Saved in:
Main Author: | SATYA DINI (NIM. 23216116), HASNA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22397 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Malaysia’s internet blackout : politicisation of online activism?
by: Cheong, Damien D., et al.
Published: (2012) -
Blackout - an augmentation technique for occlusion handling in pedestrian detection
by: Satini, Sankeerthana
Published: (2023) -
Overmacht Sebagai Batas Tanggung Gugat Pt. Pln (Persero) Pada Kasus Blackout (Studi Kasus Blackout Jakarta Pada Tanggal 4 Agustus 2019)
by: Humaidi Rizqi Alfath Syaif
Published: (2020) -
THE USE OF MOTORCYCLE ELECTRICITY SYSTEM TO SOLVE THE NEED OF ELECTRICITY WHILE PLN'S BLACKOUT
by: LILIK FRILANTIKA (NIM: 20207079), ASEP -
A robust optimization approach for protecting power systems against cascading blackouts
by: Zhai, Chao, et al.
Published: (2022)