DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018

Solar power plant is one of many renewable energy power plants that is recently considered by many countries to subtitute fossil fuel or unrenewable energy power plants in the near future. Indonesia as one of a country that located in equator line has a very high solar energy potential because of th...

Full description

Saved in:
Bibliographic Details
Main Author: PUTRANTO - (18011057), IMAM
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22547
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22547
spelling id-itb.:225472017-10-05T11:13:02ZDESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018 PUTRANTO - (18011057), IMAM Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22547 Solar power plant is one of many renewable energy power plants that is recently considered by many countries to subtitute fossil fuel or unrenewable energy power plants in the near future. Indonesia as one of a country that located in equator line has a very high solar energy potential because of the availability of the sun for a whole year hence it’s unfortune for not using this potential. Based on those facts, in this final assignment, a planning study of solar power plant will be done in one of Indonesia electrical system which is Kalimantan Selatan – Tengah electrical system. This final assignment will calculate the sum of modules, strings, and arrays from the designated solar power plant. Then a transient analysis will be held when the solar power plant subjected to the main system by using software Digsilent Power Factory 15.1. The transient analysis will be held to observe the frequency on a particular bus in the system in a normal condition and when the system subjected by a disturbances. And last, by using software PVSyst 6.4.3, energy result of solar power plant for a whole year will be calculated and the results of the calculation will be used in feasibilty price calculation by using LCOE method where the cost per-Kwh of solar power plant will be compared with feed in tariff which is stipulated in Permen ESDM No.12 Tahun 2017. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Solar power plant is one of many renewable energy power plants that is recently considered by many countries to subtitute fossil fuel or unrenewable energy power plants in the near future. Indonesia as one of a country that located in equator line has a very high solar energy potential because of the availability of the sun for a whole year hence it’s unfortune for not using this potential. Based on those facts, in this final assignment, a planning study of solar power plant will be done in one of Indonesia electrical system which is Kalimantan Selatan – Tengah electrical system. This final assignment will calculate the sum of modules, strings, and arrays from the designated solar power plant. Then a transient analysis will be held when the solar power plant subjected to the main system by using software Digsilent Power Factory 15.1. The transient analysis will be held to observe the frequency on a particular bus in the system in a normal condition and when the system subjected by a disturbances. And last, by using software PVSyst 6.4.3, energy result of solar power plant for a whole year will be calculated and the results of the calculation will be used in feasibilty price calculation by using LCOE method where the cost per-Kwh of solar power plant will be compared with feed in tariff which is stipulated in Permen ESDM No.12 Tahun 2017.
format Final Project
author PUTRANTO - (18011057), IMAM
spellingShingle PUTRANTO - (18011057), IMAM
DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018
author_facet PUTRANTO - (18011057), IMAM
author_sort PUTRANTO - (18011057), IMAM
title DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018
title_short DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018
title_full DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018
title_fullStr DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018
title_full_unstemmed DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018
title_sort design study and penetration effect of central plts 100mw on kalimantan selatan - tengah system 150kv in 2018
url https://digilib.itb.ac.id/gdl/view/22547
_version_ 1821120805311873024