DESIGN STUDY AND PENETRATION EFFECT OF CENTRAL PLTS 100MW ON KALIMANTAN SELATAN - TENGAH SYSTEM 150KV IN 2018
Solar power plant is one of many renewable energy power plants that is recently considered by many countries to subtitute fossil fuel or unrenewable energy power plants in the near future. Indonesia as one of a country that located in equator line has a very high solar energy potential because of th...
Saved in:
Main Author: | PUTRANTO - (18011057), IMAM |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22547 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF BATAM â BINTAN SYSTEM STABILITY INDICATORS RELATED TO PLTS PENETRATION PLANS
by: Fadhli R, Azman -
Perbaikan keandalan subsistem tenaga listrik 150 kV Region III Jawa Tengah dan DIY
by: , HARTOYO, et al.
Published: (2006) -
MONITORING THE CONDITION OF THE PLTS SYSTEM BASED ON INTERNET OF THINGS (IOT) TO INCREASE THE RELIABILITY OF THE PLTS SYSTEM
by: Rafif, Raihan -
Stress Analysis on The Bellows Component in 150KV SF6 Gas Insulated Switchgear
by: William Sebastian Napitupulu - 13114104, Theo -
ANALYSIS OF CONDUCTOR TOPOLOGY INSIDE SPACER TO OPTIMIZE ELECTRIC FIELD OF 150KV GIS
by: Rizal Fabio, Muhammad