OPTIMIZATION OPERATION MANAGEMENT FOR RIAM KANAN HYDROPOWER DAM TO MEET WATER RESOURCES RATE DEMAND IN BANJAR BAKULA WATER SUPPLY SYSTEM - PDAM INTAN BANJAR, SOUTH BORNEO (2010-2030)
Based on the reviews masterplan of Intan Banjar Regional Drinking Water Company, drinking water needs of the main zone is 1346 lps at 2030. To increase coverage and a water supply and ensure the future water availability, Riam Kanan hydropower dam can be made as an alternative source of raw water. T...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22618 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |