OPTIMIZATION OPERATION MANAGEMENT FOR RIAM KANAN HYDROPOWER DAM TO MEET WATER RESOURCES RATE DEMAND IN BANJAR BAKULA WATER SUPPLY SYSTEM - PDAM INTAN BANJAR, SOUTH BORNEO (2010-2030)

Based on the reviews masterplan of Intan Banjar Regional Drinking Water Company, drinking water needs of the main zone is 1346 lps at 2030. To increase coverage and a water supply and ensure the future water availability, Riam Kanan hydropower dam can be made as an alternative source of raw water. T...

Full description

Saved in:
Bibliographic Details
Main Author: DINAHKANDY (NIM : 25312033), IRMA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22618
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first