OPTIMIZATION OPERATION MANAGEMENT FOR RIAM KANAN HYDROPOWER DAM TO MEET WATER RESOURCES RATE DEMAND IN BANJAR BAKULA WATER SUPPLY SYSTEM - PDAM INTAN BANJAR, SOUTH BORNEO (2010-2030)
Based on the reviews masterplan of Intan Banjar Regional Drinking Water Company, drinking water needs of the main zone is 1346 lps at 2030. To increase coverage and a water supply and ensure the future water availability, Riam Kanan hydropower dam can be made as an alternative source of raw water. T...
Saved in:
Main Author: | DINAHKANDY (NIM : 25312033), IRMA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22618 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Analisis manfaat dan biaya Proyek Irigasi Riam Kanan di Kabupaten Banjar Kalimantan Selatan
by: , NOOR, Burhanuddin, et al.
Published: (1997) -
Uprating The Water Treatment Plant of Tirta Anom Purwaharja Water Supply Company (PDAM) Banjar City
by: Rohim, Nurul -
INTAN BANJAR, PARMATA SINGAPURA: THE STORY OF THE BANJARESE DIAMOND TRADE IN SINGAPORE THROUGH THREE MEN
by: MUHAMMAD SYAFIQ B MOHAMED S
Published: (2023) -
RIAM KANAN HYDROELECTRIC OPERATIONAL OPTIMALIZATION TO SUPPLY DWSS WATER RESOURCES RATE DEMAND BANJARBARU REGIONAL AREA
by: Triandini Maulani, Melisa -
HYDROLOGICAL WATER BALANCE PROJECTION AT MAJOR RESERVOIR CATCHMENTS IN INDONESIA : RIAM KANAN, SAGULING, BILI-BILI, BATU TEGI
by: Rachmawati, Sartika