CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL

The Kayu Tanam – Padang Panjang – Batu Tabal Railway Bridge is a structure that connects railway stations along the Kayu Tanam – Padang Panjang – Batu Tabal corridors. Back then, this route was mainly used just to carry goods. Then, due to the increase in demand and people’s needs, no...

Full description

Saved in:
Bibliographic Details
Main Author: JOSEFANNY, KARIN
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/22760
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22760
spelling id-itb.:227602017-12-18T18:47:32ZCONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL JOSEFANNY, KARIN Teknik sipil Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22760 The Kayu Tanam – Padang Panjang – Batu Tabal Railway Bridge is a structure that connects railway stations along the Kayu Tanam – Padang Panjang – Batu Tabal corridors. Back then, this route was mainly used just to carry goods. Then, due to the increase in demand and people’s needs, nowadays this route is also planned for carrying both passengers and goods. In order to reach the plan to a realization, there needs to be a construction method planning that is suitable with the existing condition of the railway bridge. This plan not only includes the construction methods, but also includes project management such as project scheduling and cost estimation that meet the requirements of quality, time and cost. The result of this planning will then be used by the owner and contractor as a reference in the bidding and construction process. <br /> <br /> <br /> The method of construction begins with the preparatory work, then is continued with the lower structure work that consists of bored pile foundation, pile caps and abutments. After the lower structure construction is finished, it is followed by the construction of the upper structure, consisting of the bridge piers, pier heads and main girders. The bridge’s foundation and piers are designed to be made of reinforced concrete, while the main girders are designed to be made of steel – warren truss, to be exact. The main railway will then be built above this steel truss. <br /> <br /> <br /> Based on the project scheduling, the duration of this project is planned to be carried out for 83 days, for which the calculation is based on two types of work, which are the work with the lead resource of heavy equipment and the work with the lead resource of labors. <br /> <br /> <br /> With all the work having been calculated and broken down into details, using the unit price method, this projects is estimated to cost Rp8.301.840.566,- In which the cost estimation is done from the planning consultants’ perspective, calculated based on specifications from shop drawings and already includes both direct and indirect costs. This Engineer’s Estimate will be used by the owner in the bidding process as a reference in choosing the project’s contractor. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
JOSEFANNY, KARIN
CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL
description The Kayu Tanam – Padang Panjang – Batu Tabal Railway Bridge is a structure that connects railway stations along the Kayu Tanam – Padang Panjang – Batu Tabal corridors. Back then, this route was mainly used just to carry goods. Then, due to the increase in demand and people’s needs, nowadays this route is also planned for carrying both passengers and goods. In order to reach the plan to a realization, there needs to be a construction method planning that is suitable with the existing condition of the railway bridge. This plan not only includes the construction methods, but also includes project management such as project scheduling and cost estimation that meet the requirements of quality, time and cost. The result of this planning will then be used by the owner and contractor as a reference in the bidding and construction process. <br /> <br /> <br /> The method of construction begins with the preparatory work, then is continued with the lower structure work that consists of bored pile foundation, pile caps and abutments. After the lower structure construction is finished, it is followed by the construction of the upper structure, consisting of the bridge piers, pier heads and main girders. The bridge’s foundation and piers are designed to be made of reinforced concrete, while the main girders are designed to be made of steel – warren truss, to be exact. The main railway will then be built above this steel truss. <br /> <br /> <br /> Based on the project scheduling, the duration of this project is planned to be carried out for 83 days, for which the calculation is based on two types of work, which are the work with the lead resource of heavy equipment and the work with the lead resource of labors. <br /> <br /> <br /> With all the work having been calculated and broken down into details, using the unit price method, this projects is estimated to cost Rp8.301.840.566,- In which the cost estimation is done from the planning consultants’ perspective, calculated based on specifications from shop drawings and already includes both direct and indirect costs. This Engineer’s Estimate will be used by the owner in the bidding process as a reference in choosing the project’s contractor.
format Final Project
author JOSEFANNY, KARIN
author_facet JOSEFANNY, KARIN
author_sort JOSEFANNY, KARIN
title CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL
title_short CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL
title_full CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL
title_fullStr CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL
title_full_unstemmed CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM – PADANG PANJANG – BATU TABAL
title_sort construction method planning for construction of railway bridge in kayu tanam ãƒâ€šã‚– padang panjang ãƒâ€šã‚– batu tabal
url https://digilib.itb.ac.id/gdl/view/22760
_version_ 1821120872288616448