CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM ̉̉ PADANG PANJANG ̉̉ BATU TABAL
The Kayu Tanam – Padang Panjang – Batu Tabal Railway Bridge is a structure that connects railway stations along the Kayu Tanam – Padang Panjang – Batu Tabal corridors. Back then, this route was mainly used just to carry goods. Then, due to the increase in demand and people’s needs, no...
Saved in:
Main Author: | JOSEFANNY, KARIN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/22760 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF THE RAILWAY BRIDGE KAYU TANAM - PADANG PANJANG - BATU TABA
by: KURNIAWAN (NIM : 15013152), DENNY -
THE PLANNING OF CONSTRUCTION METHOD OF PRESTRESSED CONCRETE RAILWAY BRIDGE IN BATU TABAL ̉̉ PADANG PANJANG ̉̉ KAYU TANAM CORRIDOR
by: RYNINTA DWI KINANTI RAHAYU, BERNADETE -
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR
by: ZIKRA AULIA, AFDAL -
SUBSTRUCTURE DESIGN AND EVALUATION OF LIKUIFACTION POTENTIAL OF RAILWAY BRIDGE IN BATU TABAL - PADANG PANJANG ̉̉ KAYU TANAM WEST SUMATERA
by: RUDOLF HAMONANGAN , GOMGOM -
SUBSTRUCTURE DESIGN OF TRAIN BRIDGE IN KAYU TANAM ̉̉ PADANG PANJANG - BATU TABAL CORRIDOR
by: HARTASURYA (NIM: 15013034), PASCA