PURPOSE OF ROOT CAUSE ANALYSIS (RCA) AND FAILURE MODES AND EFFECTS ANALYSIS (FMEA) METHODS IN OHS MANAGEMENT SYSTEM IMPLEMENTATION FOR BUILDINGS CONSTRUCTION PROJECT AT ITB GANESHA

The implementation of Occupational Health and Safety Management System (OHSMS), especially in construction industry, has not been done optimally. This research aims to analyze and evaluate the implementation of OHSMS by construction companies (contractors) who are handling the new building construct...

Full description

Saved in:
Bibliographic Details
Main Author: FERRI RAHMAN (NIM : 25313305), KMS.
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22835
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items