THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE

Al – Muzdahir Masjid Area Cibinong Science Centre is masjid renovation which previously was tbe Jami’ Al – Musyaddad Masjid, located on the west side of Indonesian Institute of Sciences (LIPI). This development is based on the need for space for activities in the area of the masjid. The pla...

Full description

Saved in:
Bibliographic Details
Main Author: GHIFFARI RACHMAN, MUHAMMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23242
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23242
spelling id-itb.:232422017-12-19T07:38:59ZTHE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE GHIFFARI RACHMAN, MUHAMMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23242 Al – Muzdahir Masjid Area Cibinong Science Centre is masjid renovation which previously was tbe Jami’ Al – Musyaddad Masjid, located on the west side of Indonesian Institute of Sciences (LIPI). This development is based on the need for space for activities in the area of the masjid. The planning of the masjid area consists of determining the construction methods, project scheduling, project cost estimation and technical specification. <br /> <br /> The construction method is planned by dividing the project into several work packages. The first package is preparatory work. The substructures work consist of spun pile and pile cap & tie beam work. The masjid structure consists of beam, column, slab, and steel roof work. Meanwhile, the minaret and the supporting building work consist of beam, column, and slab work. The parking lot work becomes the last package that consists of land clearing and installation of paving block. <br /> <br /> Based on project scheduling planning, the total duration of the construction project is 377 days. The calculation of duration is based on two types of work, which are work with the lad resource of heavy equipment and work with the lead resourcce of labours. The planning also generates the project’s critical path. <br /> <br /> For the project cost estimation, it is done by planning consultants, and the output is Engineer’s Estimate which will be used by the owner for the bidding and construction process. The cost estimation is conducted using analysis of unit prices in accordance with SNI 2008 on Unit Pricing Analysis for Building Construction. The estimated cost of the construction project is Rp 26.533.138.968; which already includes the direct and indirect costs of the project. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Al – Muzdahir Masjid Area Cibinong Science Centre is masjid renovation which previously was tbe Jami’ Al – Musyaddad Masjid, located on the west side of Indonesian Institute of Sciences (LIPI). This development is based on the need for space for activities in the area of the masjid. The planning of the masjid area consists of determining the construction methods, project scheduling, project cost estimation and technical specification. <br /> <br /> The construction method is planned by dividing the project into several work packages. The first package is preparatory work. The substructures work consist of spun pile and pile cap & tie beam work. The masjid structure consists of beam, column, slab, and steel roof work. Meanwhile, the minaret and the supporting building work consist of beam, column, and slab work. The parking lot work becomes the last package that consists of land clearing and installation of paving block. <br /> <br /> Based on project scheduling planning, the total duration of the construction project is 377 days. The calculation of duration is based on two types of work, which are work with the lad resource of heavy equipment and work with the lead resourcce of labours. The planning also generates the project’s critical path. <br /> <br /> For the project cost estimation, it is done by planning consultants, and the output is Engineer’s Estimate which will be used by the owner for the bidding and construction process. The cost estimation is conducted using analysis of unit prices in accordance with SNI 2008 on Unit Pricing Analysis for Building Construction. The estimated cost of the construction project is Rp 26.533.138.968; which already includes the direct and indirect costs of the project.
format Final Project
author GHIFFARI RACHMAN, MUHAMMAD
spellingShingle GHIFFARI RACHMAN, MUHAMMAD
THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE
author_facet GHIFFARI RACHMAN, MUHAMMAD
author_sort GHIFFARI RACHMAN, MUHAMMAD
title THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE
title_short THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE
title_full THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE
title_fullStr THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE
title_full_unstemmed THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL – MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE
title_sort planning of preparatory, substructures, superstructures, and parking lot construction work of al ãƒâ€šã‚– muzdahir masjid area cibinong science centre
url https://digilib.itb.ac.id/gdl/view/23242
_version_ 1821121014741860352