THE PLANNING OF PREPARATORY, SUBSTRUCTURES, SUPERSTRUCTURES, AND PARKING LOT CONSTRUCTION WORK OF AL ̉̉ MUZDAHIR MASJID AREA CIBINONG SCIENCE CENTRE
Al – Muzdahir Masjid Area Cibinong Science Centre is masjid renovation which previously was tbe Jami’ Al – Musyaddad Masjid, located on the west side of Indonesian Institute of Sciences (LIPI). This development is based on the need for space for activities in the area of the masjid. The pla...
Saved in:
Main Author: | GHIFFARI RACHMAN, MUHAMMAD |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23242 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PLANNING STORMWATER MANAGEMENT AND PARKING ROOM AL-MUZDAHIR MOSQUE, CIBINONG SCIENCE CENTER, LIPI
by: BAYU KAMAJAYA, INDRA -
A study of the parking lot problem
by: Cinco, Jesus Rodriguez, et al.
Published: (1975) -
Parking lot manager
by: Capule, Jason C., et al.
Published: (1995) -
Agno parking lot
by: De La Salle University, Manila
Published: (1979) -
Park me : DLSU-D Parking lot finder.
by: Sadueste, Arlan R., et al.
Published: (2014)