CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING

Scheduling is one of the most important factor in construction project. A project schedule is needed to assure that a project can work smoothly and finish on time. <br /> <br /> Project schedule provides information about when a particular task or work is to be started or finished. Witho...

Full description

Saved in:
Bibliographic Details
Main Author: MEIZA FITRIANI (NIM : 15011135), NADYA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23418
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Scheduling is one of the most important factor in construction project. A project schedule is needed to assure that a project can work smoothly and finish on time. <br /> <br /> Project schedule provides information about when a particular task or work is to be started or finished. Without a proper project schedule, a project could be <br /> <br /> delayed and overrun the project budget. This final project's scope of work is only for preparation work, foundation work and structural work. Milestone and resources are the boundary used on this design. There are two factors that affect the length of duration of the schedule which are assignment based on heavy equipment's productivity and assignment based on manpower's productivity. This project schedule design is made using software project management and gives 317 days of duration. Beside duration, the project schedule can also gives information about the critical path which is needed to be aware of so there will not be any delay.