CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING
Scheduling is one of the most important factor in construction project. A project schedule is needed to assure that a project can work smoothly and finish on time. <br /> <br /> Project schedule provides information about when a particular task or work is to be started or finished. Witho...
Saved in:
Main Author: | MEIZA FITRIANI (NIM : 15011135), NADYA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23418 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB
by: GUNAWAN )NIM: 15011145), KEVIN -
CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB
by: SEKAR PERTIWI (NIM : 15010089), GRESNA -
CONSTRUCTION MANAGEMENT DESIGN OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB MAIN BUILDING PROJECT
by: JOSUA SIMAMORA (NIM : 15011150), NAEL -
Microcontroller based rod cadle making machine.
by: Alamag, Ronnie R., et al.
Published: (2010) -
WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR
by: DAISKA WINARDI (NIM : 15007022); Dosen Pembimbing : Dr. Ir. Dhemi Harlan., M.Sc, RHEZA