CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING

Scheduling is one of the most important factor in construction project. A project schedule is needed to assure that a project can work smoothly and finish on time. <br /> <br /> Project schedule provides information about when a particular task or work is to be started or finished. Witho...

Full description

Saved in:
Bibliographic Details
Main Author: MEIZA FITRIANI (NIM : 15011135), NADYA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23418
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23418
spelling id-itb.:234182017-11-10T14:46:37ZCONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING MEIZA FITRIANI (NIM : 15011135), NADYA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23418 Scheduling is one of the most important factor in construction project. A project schedule is needed to assure that a project can work smoothly and finish on time. <br /> <br /> Project schedule provides information about when a particular task or work is to be started or finished. Without a proper project schedule, a project could be <br /> <br /> delayed and overrun the project budget. This final project's scope of work is only for preparation work, foundation work and structural work. Milestone and resources are the boundary used on this design. There are two factors that affect the length of duration of the schedule which are assignment based on heavy equipment's productivity and assignment based on manpower's productivity. This project schedule design is made using software project management and gives 317 days of duration. Beside duration, the project schedule can also gives information about the critical path which is needed to be aware of so there will not be any delay. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Scheduling is one of the most important factor in construction project. A project schedule is needed to assure that a project can work smoothly and finish on time. <br /> <br /> Project schedule provides information about when a particular task or work is to be started or finished. Without a proper project schedule, a project could be <br /> <br /> delayed and overrun the project budget. This final project's scope of work is only for preparation work, foundation work and structural work. Milestone and resources are the boundary used on this design. There are two factors that affect the length of duration of the schedule which are assignment based on heavy equipment's productivity and assignment based on manpower's productivity. This project schedule design is made using software project management and gives 317 days of duration. Beside duration, the project schedule can also gives information about the critical path which is needed to be aware of so there will not be any delay.
format Final Project
author MEIZA FITRIANI (NIM : 15011135), NADYA
spellingShingle MEIZA FITRIANI (NIM : 15011135), NADYA
CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING
author_facet MEIZA FITRIANI (NIM : 15011135), NADYA
author_sort MEIZA FITRIANI (NIM : 15011135), NADYA
title CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING
title_short CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING
title_full CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING
title_fullStr CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING
title_full_unstemmed CONSTRUCTION SCHEDULE PLANNING OF CENTER FOR ARTS, DESIGN AND LANGUAGE (CADL) ITB BUILDING
title_sort construction schedule planning of center for arts, design and language (cadl) itb building
url https://digilib.itb.ac.id/gdl/view/23418
_version_ 1821121066003595264