DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA

The Government of Indonesia has a program of 35,000 MW of electricity for Indonesia in the period 2014-2019, with the strategic objective of state electricity supply in areas that have not received electricity, increase electricity reserves by 30%, and make electricity as a driver of industrial grow...

Full description

Saved in:
Bibliographic Details
Main Author: Al Rasyid (NIM 15513021), Nurhadi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23573
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia