DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA

The Government of Indonesia has a program of 35,000 MW of electricity for Indonesia in the period 2014-2019, with the strategic objective of state electricity supply in areas that have not received electricity, increase electricity reserves by 30%, and make electricity as a driver of industrial grow...

Full description

Saved in:
Bibliographic Details
Main Author: Al Rasyid (NIM 15513021), Nurhadi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23573
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23573
spelling id-itb.:235732017-09-29T09:19:25ZDESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA Al Rasyid (NIM 15513021), Nurhadi Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23573 The Government of Indonesia has a program of 35,000 MW of electricity for Indonesia in the period 2014-2019, with the strategic objective of state electricity supply in areas that have not received electricity, increase electricity reserves by 30%, and make electricity as a driver of industrial growth and region. In the effort built PLTU to realize the program. One of them is PLTU located in Java Sea area, that is Cirebon. The plant needs coal as a raw material for electricity. In its mobilization, coal unloading terminal is needed as a means of unloading and then supplied to PLTU. <br /> <br /> The coal unloading terminal is a wharf with jetty deck on pile. Dock planning is based on environmental data, ship data, and operational data that needs to meet design criteria. Structural analysis on the dock is done to find out the ability of the structure to withstand the load working on the dock either from the port or environmental activities. The structural analysis process for this dock uses SAP2000 software by inputting the dimensions of the dock structure, dock component elements, and loads that work on the dock. <br /> <br /> The output of structural analysis using SAP2000 software is Unity Check Ratio, structural deflection, internal force, and placement reaction. Unity Check Ratio and deflection of the structure must meet the requirements that have been determined. Then the internal force is used in the process of reinforcing concrete structures such as beams, plates, and pile caps. And the placement reaction is used in the analysis of the axial carrying capacity of the soil at the stake. Then analysis the cost material for the unloading coal dock structure. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Government of Indonesia has a program of 35,000 MW of electricity for Indonesia in the period 2014-2019, with the strategic objective of state electricity supply in areas that have not received electricity, increase electricity reserves by 30%, and make electricity as a driver of industrial growth and region. In the effort built PLTU to realize the program. One of them is PLTU located in Java Sea area, that is Cirebon. The plant needs coal as a raw material for electricity. In its mobilization, coal unloading terminal is needed as a means of unloading and then supplied to PLTU. <br /> <br /> The coal unloading terminal is a wharf with jetty deck on pile. Dock planning is based on environmental data, ship data, and operational data that needs to meet design criteria. Structural analysis on the dock is done to find out the ability of the structure to withstand the load working on the dock either from the port or environmental activities. The structural analysis process for this dock uses SAP2000 software by inputting the dimensions of the dock structure, dock component elements, and loads that work on the dock. <br /> <br /> The output of structural analysis using SAP2000 software is Unity Check Ratio, structural deflection, internal force, and placement reaction. Unity Check Ratio and deflection of the structure must meet the requirements that have been determined. Then the internal force is used in the process of reinforcing concrete structures such as beams, plates, and pile caps. And the placement reaction is used in the analysis of the axial carrying capacity of the soil at the stake. Then analysis the cost material for the unloading coal dock structure.
format Final Project
author Al Rasyid (NIM 15513021), Nurhadi
spellingShingle Al Rasyid (NIM 15513021), Nurhadi
DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA
author_facet Al Rasyid (NIM 15513021), Nurhadi
author_sort Al Rasyid (NIM 15513021), Nurhadi
title DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA
title_short DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA
title_full DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA
title_fullStr DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA
title_full_unstemmed DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA
title_sort design and cost analisys of coal fired power plant unloading wharf in java sea
url https://digilib.itb.ac.id/gdl/view/23573
_version_ 1821840600644714496