DESIGN AND COST ANALISYS OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA
The Government of Indonesia has a program of 35,000 MW of electricity for Indonesia in the period 2014-2019, with the strategic objective of state electricity supply in areas that have not received electricity, increase electricity reserves by 30%, and make electricity as a driver of industrial grow...
Saved in:
Main Author: | Al Rasyid (NIM 15513021), Nurhadi |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23573 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF COAL FIRED POWER PLANT UNLOADING WHARF IN JAVA SEA USING PRECAST CONCRETE
by: Mahatma Bagaskara (NIM : 15513051), Rabbani -
LOCATION MODEL OF COAL BLENDING FACILITIES TO ENSURE COAL SUPPLY FOR COAL FIRED POWER PLANTS IN JAVA ISLAND
by: Ikhsan Pratama, Hanif -
DOMESTIC COAL PRICES ANALYSIS FOR NON-MINE MOUTH COAL FIRED POWER PLANTS BASED ON PRODUCTION COST
by: Adwitiya Hadi, Siwi -
EVALUATION OF AMMONIA CO-FIRING FOR COAL FIRED POWER PLANT RETROFIT
by: Danella Christabel I, Audrey -
EVALUATION OF AMMONIA CO-FIRING FOR COAL FIRED POWER PLANT RETROFIT
by: Calvin, Steve