STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD
Breakwater structure is built on a reclamation area in Lamong Bay because the ground water level is high enough so the sand embankment must be supported by breakwater to make the embankment still stands in the staged construction. Because the subsoil consists of soft soil, the structure of the break...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/23917 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |