STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD

Breakwater structure is built on a reclamation area in Lamong Bay because the ground water level is high enough so the sand embankment must be supported by breakwater to make the embankment still stands in the staged construction. Because the subsoil consists of soft soil, the structure of the break...

Full description

Saved in:
Bibliographic Details
Main Author: ANDRESON, REY
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/23917
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia