STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD

Breakwater structure is built on a reclamation area in Lamong Bay because the ground water level is high enough so the sand embankment must be supported by breakwater to make the embankment still stands in the staged construction. Because the subsoil consists of soft soil, the structure of the break...

Full description

Saved in:
Bibliographic Details
Main Author: ANDRESON, REY
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/23917
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23917
spelling id-itb.:239172017-12-08T13:05:05ZSTUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD ANDRESON, REY Teknik sipil Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23917 Breakwater structure is built on a reclamation area in Lamong Bay because the ground water level is high enough so the sand embankment must be supported by breakwater to make the embankment still stands in the staged construction. Because the subsoil consists of soft soil, the structure of the breakwater should be given the reinforcement so that the soil does not collapse, such as the construction of a bamboo matrass and bamboo cluster under the structure of the breakwater. <br /> <br /> <br /> Ground improvement in this reclamation area using Prefabricated Vertical Drain. triangular configuration with spacing of 1 meter. Construction of the sand embankment is done in stages so the embankment will not collapse and increase bearing capacity (gained strength) through the consolidation process. Because of the material of the embankment is sand, so there is a potential for liquefaction, therefore the embankment need the improvement using Vibro Compaction. <br /> <br /> <br /> PLAXIS 2D will give the model for finite element method and slope stability analysis. The results of slope stability analysis by PLAXIS 2D shown the embankment conditions, earthquakes, and service life meets the requirements of SF minimum value. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
ANDRESON, REY
STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD
description Breakwater structure is built on a reclamation area in Lamong Bay because the ground water level is high enough so the sand embankment must be supported by breakwater to make the embankment still stands in the staged construction. Because the subsoil consists of soft soil, the structure of the breakwater should be given the reinforcement so that the soil does not collapse, such as the construction of a bamboo matrass and bamboo cluster under the structure of the breakwater. <br /> <br /> <br /> Ground improvement in this reclamation area using Prefabricated Vertical Drain. triangular configuration with spacing of 1 meter. Construction of the sand embankment is done in stages so the embankment will not collapse and increase bearing capacity (gained strength) through the consolidation process. Because of the material of the embankment is sand, so there is a potential for liquefaction, therefore the embankment need the improvement using Vibro Compaction. <br /> <br /> <br /> PLAXIS 2D will give the model for finite element method and slope stability analysis. The results of slope stability analysis by PLAXIS 2D shown the embankment conditions, earthquakes, and service life meets the requirements of SF minimum value.
format Final Project
author ANDRESON, REY
author_facet ANDRESON, REY
author_sort ANDRESON, REY
title STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD
title_short STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD
title_full STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD
title_fullStr STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD
title_full_unstemmed STUDY DESIGN LAMONG BAY RECLAMATION CONSTRUCTION USING GROUND IMPROVEMENT VIBRO COMPACTION AND PREFABRICATED VERTICAL DRAIN WITH FINITE ELEMENT METHOD
title_sort study design lamong bay reclamation construction using ground improvement vibro compaction and prefabricated vertical drain with finite element method
url https://digilib.itb.ac.id/gdl/view/23917
_version_ 1822921060553588736