PLANNING TECHNICAL PLANT KARAI 7 IN SIMALUNGUN REGENCY, NORTH SUMATERA

The electricity demand in North Sumatra is estimated to increase by about 10% every year. However, there is a gap between the power output capability of 2012 at 1.549 MW against the projected peak demand in 2030 of 3.493 MW. The prolonged shortage of electricity in North Sumatra has reached 200 MW,...