PLANNING TECHNICAL PLANT AEK SIBUNDONG IN HUMBANG HASUNDUTAN REGENCY, NORTH SUMATERA, INDONESIA
Indonesia's electricity needs continue to increase from year to year. Based on data from the National Electricity Supply Plan (RUPTL) for 2012-2021, PLN projects electricity consumption in the country in 2020 to reach 358 TWh with a peak load of around 61.750 MW. PLN plans to develop a power pl...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39534 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |