PLANNING TECHNICAL PLANT AEK SIBUNDONG IN HUMBANG HASUNDUTAN REGENCY, NORTH SUMATERA, INDONESIA
Indonesia's electricity needs continue to increase from year to year. Based on data from the National Electricity Supply Plan (RUPTL) for 2012-2021, PLN projects electricity consumption in the country in 2020 to reach 358 TWh with a peak load of around 61.750 MW. PLN plans to develop a power pl...
Saved in:
Main Author: | Raynanda Lubis, Aufar |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39534 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BASIC DESIGN OF ALTERNATIVE III MINIHIDRO POWER PLANT AT AEK SUBUNDONG RIVER, HUMBANG HASUNDUTAN, NORTH SUMATERA
by: Oktriani, Dini -
Sifat-sifat teknis beton normal menggunakan pasir Aek Sibundong dan batu pecah Nagasaribu Kabupaten Humbang Hasundutan
by: , SIHOMBING, Froles Riduan, et al.
Published: (2008) -
GEOLOGY AND HYDROGEOLOGY OF BAKARA DISTRICT, HUMBANG HASUNDUTAN REGENCY, NORTH SUMATERA
by: Ghazali Putera, Muhammad -
PLANNING OF AEK SIBUNDONG MINI HYDRO POWER PLANT, SIGULOK VILLAGE, NORTH SUMATERA
by: Nissa Yalfis, Vashtia -
Evaluasi pelaksanaan Program Gizi Puskesmas di Kabupaten Humbang Hasundutan
by: , HARIANJA, Saritua, et al.
Published: (2007)