AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R

Casing and cementing design as well as mud planning are required to be done prior to drilling a well. This concern is closely related to the success and attainment of effective and efficient drilling operation. The present final project examines those issues for Well Matoa-7R. <br /> <br...

Full description

Saved in:
Bibliographic Details
Main Author: SUHERI KURNIAWAN (NIM : 12299049)
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24410
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:24410
spelling id-itb.:244102017-09-27T10:37:32ZAN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R SUHERI KURNIAWAN (NIM : 12299049), Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/24410 Casing and cementing design as well as mud planning are required to be done prior to drilling a well. This concern is closely related to the success and attainment of effective and efficient drilling operation. The present final project examines those issues for Well Matoa-7R. <br /> <br /> <br /> Well Matoa-7R is a substitution well for previous Well Matoa-7 that used to use an electric submersible pump (ESP). It was discovered that when the pump is needed to be repaired, it could not be pulled out of the hole even after a fishing job. This was because the well collapsed at a depth of 6046 ft. The well was then abandoned. Consequently, a well must be drilled near Matoa-7 since the well is believed to still have high potential of production. The substituted Well Matoa-7R was drilled at a location of only 10-meter away from Matoa-7. <br /> <br /> <br /> Specific characteristic of Well Matoa-7R, e.g. high temperature (2200F) with total depth of 9650 ft, have challenged the operator to carefully plan the next drilling operations. Evaluation on casing and cementing design as well as mud planning of Well Matoa-7R is then essential. Results of this evaluation were compared to the actual drilling operation completed for Well Matoa-7R. New designs for the three issues were the final result of the present study text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Casing and cementing design as well as mud planning are required to be done prior to drilling a well. This concern is closely related to the success and attainment of effective and efficient drilling operation. The present final project examines those issues for Well Matoa-7R. <br /> <br /> <br /> Well Matoa-7R is a substitution well for previous Well Matoa-7 that used to use an electric submersible pump (ESP). It was discovered that when the pump is needed to be repaired, it could not be pulled out of the hole even after a fishing job. This was because the well collapsed at a depth of 6046 ft. The well was then abandoned. Consequently, a well must be drilled near Matoa-7 since the well is believed to still have high potential of production. The substituted Well Matoa-7R was drilled at a location of only 10-meter away from Matoa-7. <br /> <br /> <br /> Specific characteristic of Well Matoa-7R, e.g. high temperature (2200F) with total depth of 9650 ft, have challenged the operator to carefully plan the next drilling operations. Evaluation on casing and cementing design as well as mud planning of Well Matoa-7R is then essential. Results of this evaluation were compared to the actual drilling operation completed for Well Matoa-7R. New designs for the three issues were the final result of the present study
format Final Project
author SUHERI KURNIAWAN (NIM : 12299049),
spellingShingle SUHERI KURNIAWAN (NIM : 12299049),
AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
author_facet SUHERI KURNIAWAN (NIM : 12299049),
author_sort SUHERI KURNIAWAN (NIM : 12299049),
title AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
title_short AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
title_full AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
title_fullStr AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
title_full_unstemmed AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
title_sort evaluation on casing design, cementing, and mud planning for well matoa-7r
url https://digilib.itb.ac.id/gdl/view/24410
_version_ 1821844662637297664