AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
Casing and cementing design as well as mud planning are required to be done prior to drilling a well. This concern is closely related to the success and attainment of effective and efficient drilling operation. The present final project examines those issues for Well Matoa-7R. <br /> <br...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24410 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!