AN EVALUATION ON CASING DESIGN, CEMENTING, AND MUD PLANNING FOR WELL MATOA-7R
Casing and cementing design as well as mud planning are required to be done prior to drilling a well. This concern is closely related to the success and attainment of effective and efficient drilling operation. The present final project examines those issues for Well Matoa-7R. <br /> <br...
Saved in:
Main Author: | SUHERI KURNIAWAN (NIM : 12299049) |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24410 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STRATEGY FORMULATION IN CREATIVE INDUSTRY FOR GROWING COMPETITIVENESS OF PT. MATOA INDONESIA DIGDAYA
by: GILANG PRAKASA (NIM: 29115651), M -
Role of Bayer red mud and phosphogypsum in cement-stabilized dredged soil with different water and cement contents
by: Wan, Xing, et al.
Published: (2024) -
Induksi kalus pada budidaya jaringan daun matoa (Pometia pinnata Forst.) secara in vitro
by: , CHRYSTOMO, Linus Yhani, et al.
Published: (1997) -
WELL CASING DESIGN FOR PLAN OF XXX GEOTHERMAL FIELD DEVELOPMENT
by: SYARIF HIDAYATULLAH (NIM : 22608004); Pembimbing : Dr-Ing. Bonar Tua Halomoan Marbun, DENI -
Water Flow Characteristic Investigation of Horizontal Screw Pump for Planned Mud Pump
by: FIRMANSYAH (NIM 13104053), ENDY