NON-PRODUCTIVE WORKING HOURS REDUCTION IN CENTRAL SERVICES DIVISION PT FREEPORT INDONESIA
Central Services is the division that responsible to provide service in developing and constructing <br /> <br /> required infrastructure to support mining operation in PT Freeport Indonesia (PTFI), a <br /> <br /> multinational mining company operated in Indonesia. In early...
Saved in:
Main Author: | BIRINGKANAE 29115279, SUMARNIWAN |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24417 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PRODUCTION CAPACITY IMPROVEMENT USING SIX SIGMA AT CONCENTRATING DIVISION PT FREEPORT INDONESIA
by: Virad Abidondifu, Alfred -
STRATEGY TO IMPROVE SERVICE CONTRACTOR EMPLOYEE TECHNICAL CAPABILITY AT OPERATION MAINTENANCE DIVISION IN PT FREEPORT INDONESIA
by: M.N Waturandang, Yullia -
IMPROVEMENT SUPPLY PROCESS TO INCREASE SERVICE LEVEL STUDY CASE SUPPLY CHAIN DIVISION PT FREEPORT INDONESIA
by: SURYA ATMAJA TRIJAYA SITORUS 29115288, SUHARTO -
BUSINESS PROCESS IMPROVEMENT OF EQUIPMENT POOL SYSTEM IN THE SUPPORT DIVISION OF PT FREEPORT INDONESIA
by: Firdaus, Frans -
DESIGNING KNOWLEDGE MANGEMENT SYSTEM FOR KNOWLEDGE INTENSIVE DIVISION STUDY CASE OF MINE MAINTENANCE DIVISION PT. FREEPORT INDONESIA
by: SETYAWAN YUNIANTO 29115297, DIDIK