FEASIBILITY STUDY OF NON-PRODUCTIVE WELL UTILIZATION IN GEOTHERMAL BY USING MULTIPHASE PUMP–CASE STUDY OF ULUBELU GEOTHERMAL AREA)

<p align="justify">The production rate of geothermal wells is decreasing over time, so the amount of steam supply to the Geothermal Power Plants (GPPs) is also decreasing. Generally, to maintain the production, drilling make-up wells should be conducted. On the other hand, there are...

Full description

Saved in:
Bibliographic Details
Main Author: ALFANDI AHMAD (NIM: 22615302), ANGGA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25574
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items