#TITLE_ALTERNATIVE#

An economic costs model for CO2-EOR project constructed in this study can be used to simply calculate investments and operating costs required for a CO2-EOR project. In this study, the costs model is validated with a CO2 pilot injection project pre-feasibility study in South Sumatera. Aside from the...

全面介紹

Saved in:
書目詳細資料
主要作者: AHMAD NAUFAL (NIM : 12214083), AULIA
格式: Final Project
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/25914
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia