Management Aspect Design of Liquefied Natural Gas Dock Gorontalo Gas Power Plant Construction Project
<p align="justify">The construction of the Gorontalo Gas Power Plant located in the Village of Maleo, Paguat District, Pohuwato Regency, Gorontalo Province is one of the solutions from the government for the people in Gorontalo. The construction of the Gorontalo Gas Power Plant which...
Saved in:
Main Author: | Putro Suryo Condro - NIM: 15512074 , Bimo |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26120 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
The prospects of liquefied natural gas (LNG) in Singapore
by: Tay, Freddie Kai Xu
Published: (2015) -
Feasibility study of liquefied natural gas bunkering
by: Ma, Ran
Published: (2012) -
Feasibility study of liquefied natural gas bunkering
by: Qin, Di
Published: (2012) -
The prospects of liquefied natural gas (LNG) in Singapore
by: Ong, Pei Wen
Published: (2015) -
Feasibility study of liquefied natural gas bunkering
by: Sun, Lu.
Published: (2012)