STUDY OF DOZER NEEDS FOR MATERIAL DOZING AT PIT PARINGIN WASTE DUMP

<p align="justify">In open pit coal, overburden stripping is one of the most important things in open pit mining method. Overburden material is usually dump at waste dump. Dozer is usually used for dozing the waste material at waste dump to spread or remove the muck pile. PT Bukit Ma...

Full description

Saved in:
Bibliographic Details
Main Author: AGUSTO - Nim: 12114023 , FERNANDO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27300
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items