HYDROGEOLOGICAL MODELLING FOR GROUNDWATER MANAGEMENT PLANNING IN PURNAMA PIT, PT. AGINCOURT RESOURCES, SUMATRA UTARA
<p align="justify">Excess groundwater in Martabe gold mine, which belongs to PT. Agincourt Resources (PTAR) will become problem for mining process, so dewatering process must be conducted. Dewatering plan is applied with pumping wells and drain holes in mining location. Accurate dril...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27362 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |