HYDROGEOLOGICAL MODELLING FOR GROUNDWATER MANAGEMENT PLANNING IN PURNAMA PIT, PT. AGINCOURT RESOURCES, SUMATRA UTARA

<p align="justify">Excess groundwater in Martabe gold mine, which belongs to PT. Agincourt Resources (PTAR) will become problem for mining process, so dewatering process must be conducted. Dewatering plan is applied with pumping wells and drain holes in mining location. Accurate dril...

Full description

Saved in:
Bibliographic Details
Main Author: Fauziyyah - Nim: 22715003 , Fithriyani
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27362
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items